Railway Bride 225H

Detail

From Date: 17/05/2016 08:00

To Date: 17/05/2016 18:00 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Leeds & Liverpool Canal

Starts at: Bridge 225H, Railway Bridge

Ends at: Bridge 225H, Railway Bridge

Description

Please be advised that Contractors (Dyer & Butler) are carrying out bridge survey works on behalf of Network Rail under the Railway bridge.

The canal will be restricted at this location due to the use of a floating pontoon with scaffold. 

All boat traffic should take caution when passing and abide by the contractors advice, this may result in delay of no longer than 15-20 minutes

Please slow down when approaching the bridge and be prepared to stop if requested.  Delays not exceeding 15-20 minutes

Thank you for your patience.