Acton Swing Bridge, Weaver Navigation
Detail
From Date: 23/01/2017 08:00
To Date: 31/03/2017 18:00 inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Location
Closest waterway: Weaver Navigation
Starts at: Acton Swing Bridge
Ends at: Acton Swing Bridge
Upstream winding hole: Weaver Navigation Arm, near Acton Lane
Downstream winding hole: Frodsham Cut (Weaver Navigation) Junction
Updates
13/12/2016 11:49
Due to the installation of scaffolding, the bridge will not be able to swing/be opened between the dates of 23rd of January to the 31st of March 2017. However - craft with an air-draft of less than 2.5 meters will still be able to pass under the bridge, but may need to wait a short period for the site to be made safe.
Description
Bridge strengthening works