Between Wharf Road (Bridge 39) and Packington Square Bridge (Bridge 40), Regent's Canal
Detail
From Date: 27/04/2016 07:00
To Date: 30/04/2016 08:00 inclusive
Type: Towpath Closure
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Regent's Canal
Starts at: Bridge 39, Wharf Road
Ends at: Bridge 40, Packington Square Bridge
Description
Scaffolding is to be erected above the towpath on the Regent's Canal between Wharf Road (Bridge 39) and Packington Square Bridge (Bridge 40). The towpath will be closed from 7am to 8am on 27 April 2016 and from 7am to 8am on 30 April 2016. Mooring will be suspended.