Railway Bridge 2B
Detail
From Date: 18/04/2016 08:00
To Date: 22/04/2016 17:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Erewash Canal
Starts at: Bridge 2B
Ends at: Bridge 2B
Description
Contractors (Prima Services) are carrying out bridge inspection works under the Railway Bridge. The canal will be restricted at this location due to the use of a floating pontoon.
All boat traffic should slowdown, approach the bridge with caution and be prepared to stop if requested. Short delays up to 10/15 minutes may be necessary for contractors to move the floating pontoon.