Padworth Swingbridge No: 27
Detail
From Date: 23/05/2016 08:30
To Date: 23/05/2016 17:00 inclusive
Type: Navigation Restriction
Reason: Repair
Is the towpath closed? No
Location
Closest waterway: Kennet & Avon Canal
Starts at: Bridge 27, Padworth Swingbridge
Ends at: Bridge 27, Padworth Swingbridge
Updates
01/04/2016 15:23
The date to install the pedestals has now been changed to Monday 23rd May.
Our contractors will be onsite during this time updating the bridge control system. The bridge will be open at the following times to allow any boats to pass:
9.00 - 10:00
12:00 - 13:00
15:00 - 16:00
Many thanks in advance for your patience
03/03/2016 16:21
Our contractors will be onsite during this time updating the bridge control system. The bridge will be open at the following times to allow any boats to pass:
9.00 - 10:00
12:00 - 13:00
15:00 - 16:00
Many thanks in advance for your patience
03/03/2016 10:46
Our contractors Keir are working to remove an old pedestal, to remove an obsolete user interface display with engraved instruction plate.) Other minor works on control system to align with current standards
Restricted operation will remain possible an agreed specific times 09:00am till 10:00am, 12:00pm till 13:00pm and 15:00pm till 16:00pm
Description
Our contractors Keir are working to remove an old pedestal, to remove an obsolete user interface display with engraved instruction plate.) Other minor works on control system to align with current standards
Restricted operation will remain possible an agreed specific times 09:00am till 10:00am, 12:00pm till 13:00pm and 15:00pm till 16:00pm