Railway Bridge (Bridge 23), Lee Navigation, Tottenham

Detail

From Date: 05/12/2016 07:00

To Date: 19/09/2016 14:00 inclusive

Type: Navigation Closure

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Lee Navigation

Starts at: Bridge 23 (Railway)

Ends at: Bridge 23 (Railway)

Description

During the 2016/17 winter, Network Rail are planning to replace the railway bridge over the Lee Navigation in Tottenham (Bridge 23). This will see disruption to navigation and closure of the towpath. We have been working with Network Rail to ensure that this is for as short a time as possible.

Currently, the plan is for the navigation to be closed from 5 December 2016 to 12 December 2016 and then again from 2 January 2017 to 10 January 2017.

There will be a navigation restriction in place between 12 December and 2 January 2017 and from 10 January to 15 January 2017, during which time there may be disruptions to up to 30 minutes.

The towpath will be closed for the entire duration of the works (5 December to 15 January 2017) and a diversion in place.