Ickles Lock Pipeline
Detail
From Date: 28/03/2016 07:00
To Date: 18/04/2016 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Sheffield & South Yorkshire Nav
Starts at: 900Mm Diam. Pipe Crossing
Ends at: 900Mm Diam. Pipe Crossing
Description
Contractors (BOC) are carrying out preparation and painting works to the pipe crossing, with access from a fixed scaffold which is fully encapsulated.
All boat traffic should take caution when passing and abide by the contractors advice, this may result in delay of no longer than 15-20 minutes.