Saxilby Railway Bridge 2A - Fossdyke Canal

Detail

From Date: 25/09/2023 00:00

To Date: 29/09/2023 23:59 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Fossdyke Canal

Starts at: Bridge 2A, Saxilby Railway Bridge

Ends at: Bridge 2A, Saxilby Railway Bridge

Description

Third party contractors need to undertake some minor works to Saxilby railway bridge 2A on the Fossdyke canal between 25th and 29th September.

The works will involve masonry repairs and vegetation clearance to the soffit, abutments and wingwalls of the bridge structure which will require the use of a tower scaffold and floating pontoon.

Navigation traffic may be delayed by up to 30 minutes to allow the contractors to clear the navigation channel under the bridge. Boats should pass the works location with caution and follow any instructions given on site.