Description
A canal restriction is required for the Installation of hydraulics to allow the bridge to be raised & lowered via a windlass. Boaters may be asked to wait for up to 15 minutes before continuing on their journey.
The charity making life better by water
Making life better by water
Starts: 18 September 2023 08:00 am
Ends: 29 September 2023 04:00 pm inclusive
Type: Navigation Restriction
Reason: Repair
Is the towpath closed? No
Closest waterway | Oxford Canal |
Starts at | Bridge 219, Shipton Lift Bridge |
Ends at | Bridge 219, Shipton Lift Bridge |
Upstream winding hole | Between Bridge 215 (Caravan Lift Bridge) and Bridge 215A (Railway) |
Downstream winding hole | Bridge 221, Thrupp Wide |
A canal restriction is required for the Installation of hydraulics to allow the bridge to be raised & lowered via a windlass. Boaters may be asked to wait for up to 15 minutes before continuing on their journey.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration