Bridge 28, Aldermaston Wharf Lift Bridge, Aldermaston

Detail

From Date: 26/02/2024 08:00

To Date: 15/03/2024 16:00 inclusive

Type: Navigation Closure

Reason: 3rd Party Works

Is the towpath closed? Yes

Location

Closest waterway: Kennet & Avon Canal

Starts at: Bridge 28 (Lift Bridge)

Ends at: Bridge 28 (Lift Bridge)

Upstream winding hole: Between Aldermaston Lift bridge (28) and Aldermaston Lock (95)

Downstream winding hole: East of Ufton Swing bridge (25A)

Description

A navigation and towpath stoppage is required to allow Third Party Contractors, working on behalf of West Berkshire Council, to reinstall a refurbished highway bridge deck.