Aire & Calder Navigation Ferrybridge to Bank Dole
Detail
From Date: 10/08/2022 08:00
To Date: 31/08/2022 17:00 inclusive
Type: Advice
Reason: Information
Is the towpath closed? No
Intersection of
Closest waterway: Aire & Calder Navigation Main Line
Starts at: Lock 11, Ferrybridge Flood Lock
Ends at: Skew Bridge
AND
Closest waterway: Bank Dole Cut
Starts at: Bank Dole Lock (Lock 5)
Ends at: Bank Dole Lock (Lock 5)
Description
Dredging will be taking place in the channel from Ferrybridge Flood Lock to Bank Dole Lock.
Please take extra care when travelling through this area and be vigilant for slow moving, laden or stationery dredging craft, especially at some of the narrower sections of waterway and around tighter bends where sight lines are restricted.