Description
A stoppage is required. Contractors will be carrying out grouting works at the lock to seal voids and stop leakage from the structure which is flooding a nearby property.
The charity making life better by water
Making life better by water
Starts: 7 November 2022 08:00 am
Ends: 18 November 2022 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Huddersfield Narrow Canal |
Starts at | Lock 14 East, Ramsden Lock |
Ends at | Lock 14 East, Ramsden Lock |
Upstream winding hole | Windinghole - Lock 16 |
Downstream winding hole | Winding Hole - Milnsbridge Marina |
A stoppage is required. Contractors will be carrying out grouting works at the lock to seal voids and stop leakage from the structure which is flooding a nearby property.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration