Description
A stoppage is required to carry out some repair works. Resin grouting will be put behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
The charity making life better by water
Making life better by water
Starts: 14 November 2022 08:00 am
Ends: 2 December 2022 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Huddersfield Narrow Canal |
Starts at | Lock 24 East |
Ends at | Lock 24 East |
Upstream winding hole | Winding Hole just above Lock 31 |
Downstream winding hole | Winding Hole between Locks 16 and 17 |
A stoppage is required to carry out some repair works. Resin grouting will be put behind the lock walls to fill up any voids and prevent deterioration of the lock structure.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration