Crick Tunnel North Portal to Cracks Hills Farm Bridge - Leicester Line

Detail

From Date: 30/05/2022 00:00

To Date: 06/06/2022 23:59 inclusive

Type: Event

Is the towpath closed? No

Location

Closest waterway: Leicester Line (Grand Union Canal)

Starts at: Crick Tunnel

Ends at: Bridge 15, Crack's Hill Farm Bridge

Updates

05/05/2022 12:43

There will be mooring restrictions from the 30th May to the 6th June (inclusive) for the Crick Boat Show.  

The restriction will be from the North Portal of Crick Tunnel to Crack's Hill Farm Bridge.

During this period these designated online show moorings are under the control of Crick Boat Show, on behalf of WW Shows Ltd.

Boaters found to be mooring within these areas, who have not pre-booked will be politely asked to vacate the mooring. 

Description

There will be mooring restrictions from the 30th May to the 6th June (inclusive) for the Crick Boat Show.  

The restriction will be from the North Portal of Crick Tunnel to Crack's Hill Farm Bridge.

During this period these designated online show moorings are under the control of Crick Marina Ltd and behalf of Waterways World and Canal & River Trust.

Boaters found to be mooring within these areas, who have not pre-booked will be politely asked to vacate the mooring.