Updates
16/12/2021 15:58
Our local team will be closing Cranfleet Flood Gates tomorrow, in preparation for our contractors working on behalf of Network Rail, who are carrying out a full bridge replacement during the stoppage.
Details of this can be found on the link below - https://canalrivertrust.org.uk/notices/19544-bridge-7-railway-bridge-sawley-upper-trent
This does mean that the navigation will be closed at this location, until the works are completed on the 4th January.
The towpath and suspend towpath moorings between Bridges 7 and 8 on Cranfleet Cut will still be closed until the 21st January.
A diversion is in place for the towpath, with separate, alternative routes signed for foot traffic and wheeled traffic, both routing from above Trent Lock on the Erewash Canal to Bridge 8 on Cranfleet Cut.
Note that these diversions are on Public Rights of Way that are, in part, unsurfaced, and may deteriorate in poor weather. Gates have been provided in place of stiles on the diversionary route for wheeled users. Please ensure these gates are closed after use.