Fairburn Ings Railway Bridge Dive Inspection
Detail
From Date: 21/10/2021 08:00
To Date: 22/10/2021 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Aire & Calder Navigation Main Line
Starts at: Fairburn Railway Bridge
Ends at: Fairburn Railway Bridge
Description
Contractors will be carrying out an Inspection of the Bridge structure for a routine maintenance check on the underwater elements of the railway bridge using divers in the watercourse.
Skippers of all craft are to be advised that there maybe a short delay to enable the divers to move to ensure safe passage.