Lemonroyd Lock - Sluice

Detail

From Date: 15/09/2021 08:00

To Date: 15/09/2021 11:30 inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? No

Location

Closest waterway: Aire & Calder Navigation Main Line

Starts at: Lock 7, Lemonroyd Lock

Ends at: Lock 7, Lemonroyd Lock

Updates

15/09/2021 11:19

The stop planks have been removed and the lock will be  open and fully operational from 11.30am

Thank you for your patience while these necessary works have been undertaken.  

14/09/2021 16:12

Repairs to the upper east side sluice have been successfully completed. Our Operations and Mechanical & Engineering teams will be removing the stop planks from the sluice intake on the morning of 15th of September between 8am and 12noon, During this time Lemonroyd Lock will be closed to navigation.

Apologies for any inconvenience this may cause

01/09/2021 14:14

Contractors will be carrying out repair works to the upper east side sluice on the 7th of September between 8am and 1pm, therefore during this time Lemonroyd Lock will be closed to navigation.

Apologies for any inconvenience this may cause.

06/08/2021 16:38

Our Mechanical & Engineering Team will be dewatering the upstream west side sluice to undertake repairs to the hydraulic pipe work and bring this sluice back into full working operational use.

Further works are planned to take place during September to undertake repairs to the upper east side sluice.   The stoppage should be no more than one day in duration.

27/07/2021 18:36

The planned works today involving divers to undertake repairs to upper sluices has been completed and the lock is now open for navigation.

Further works are planned to take place during August and September to complete repairs.  Once dates and details are know an updated noticed will be published giving full details.  The stoppages should each be no more than one day in duration.

19/07/2021 12:05

Divers will be in the water to undertake repairs to the upper sluices.

Passage through the lock will not be possible during these repairs.

18/07/2021 10:37

The engineers have visited site and the fault has now been fixed.

The lock is open and operational

18/07/2021 10:27

The engineers have vis8ited site and the fault has now been fixed.

The lock is open and operational

Description

The downstream pedestal at Lemonroyd Lock has developed a fault and will not accept a key, therefore it cannot be operated at this time.

The upstream offside sluice has also developed a fault. This means the sensors will not align and allow the sluice to close properly.

An engineer has been booked to attend on Sunday morning, the 18th July 2021, and an update will be given once information is recevied from site.