Lock 11, Ferrybridge Flood Lock, Aire & Calder Navigation
Detail
From Date: 19/07/2021 08:00
To Date: 13/08/2021 13:30 inclusive
Type: Advice
Reason: Information
Is the towpath closed? No
Location
Closest waterway: Aire & Calder Navigation Main Line
Starts at: Lock 11, Ferrybridge Flood Lock
Ends at: Lock 11, Ferrybridge Flood Lock
Upstream winding hole: Junction with Wakefield Branch
Downstream winding hole: Junction with Bank Dole Cut
Updates
13/08/2021 13:37
Repairs have been carried out and the lock is now operational.
Description
A stoppage is required to replace the downstream gates and cills. Check and repair downstream sluices.
Access to the Towpath and Moorings is still available.