Lock 11, Ferrybridge Flood Lock, Aire & Calder Navigation

Detail

From Date: 19/07/2021 08:00

To Date: 13/08/2021 13:30 inclusive

Type: Advice

Reason: Information

Is the towpath closed? No

Location

Closest waterway: Aire & Calder Navigation Main Line

Starts at: Lock 11, Ferrybridge Flood Lock

Ends at: Lock 11, Ferrybridge Flood Lock

Upstream winding hole: Junction with Wakefield Branch

Downstream winding hole: Junction with Bank Dole Cut

Updates

13/08/2021 13:37

Repairs have been carried out and the lock is now operational. 

Description

A stoppage is required to replace the downstream gates and cills. Check and repair downstream sluices.

Access to the Towpath and Moorings is still available.