Description
Refurbishment and Improvement works to the waterway wall and moorings at the Lisson Grove mooring site.
Works will be undertaken by Land and Water Services using floating plant.
The works will include localised dewatering and piling along the waterway wall. As such, the navigation width past the Lisson Grove moorings may be reduced to no less than 5.4m during the period of the works. Some disturbance to navigation may also be experienced as floating plant is repositioned in the vicinity of the works, but any potential disruption will be kept to a minimum.