Goole Railway Bridge Inspection
Detail
From Date: 26/05/2020 07:00
To Date: 26/05/2020 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Aire & Calder Navigation Main Line
Starts at: Goole Railway Bridge
Ends at: Goole Railway Bridge
Description
Stroma will be undertaking a bridge inspection with a pontoon and fixed scaffold.
Inspection of the bridge using a pontoon and fixed scaffold to access each part of the structure in a safe manner.
Skippers should slow down on approaching the bridge and be prepared to stop if requested. Delays of less than 20 minutes may occur whilst the inspection pontoon is moved out of the way.
Please follow the government advice – stay alert, control the virus, save lives.