Selby Swing Bridge No 1
Detail
From Date: 24/04/2020 20:00
To Date: 25/04/2020 01:30 inclusive
Type: Navigation Closure
Reason: Vandalism
Is the towpath closed? No
Location
Closest waterway: Selby Canal
Downstream winding hole: Selby Basin
Updates
25/04/2020 13:24
The issue with controls has now been repaired and the swing bridge is now back in operation.
Description
Due to vandalism to the bridge controls, the swing bridge is currently out of operation.
Engineers booked to attend 25/04, further update will be provided once attended.