Railway Bridge Inspection, Bridge 7D, Old Oak Common, Grand Union Canal (Paddington Arm)

Detail

From Date: 30/03/2020 00:00

To Date: 30/03/2020 23:59 inclusive

Type: Advice

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Paddington Arm (Grand Union Canal)

Starts at: Bridge 7D (Railway)

Ends at: Bridge 7D (Railway)

Description

Please be advised that Network Rail inspectors will be carrying out an inspection on the above bridge on Monday 30 March from a floating platform.

Please slow down on approach and pass the works with care. The platform will be moved out of the way for passing boats

Railway Bridge Inspection to be undertaken on Monday 30th March for 1 day.

Inspection carried out from floating working platform, powered by an outboard engine – Inspectors will move out of the way for passing boaters, No restrictions in place.

Towpath & Navigation always open.

Advanced warning signage erected north and south of works, prewarning boaters of works ahead.