New Junction Canal Don Doors
Detail
From Date: 14/12/2019 09:00
To Date: 15/12/2019 17:45 inclusive
Type: Advice
Reason: Information
Is the towpath closed? No
Location
Closest waterway: New Junction Canal
Starts at: River Don U/S Flood Doors
Ends at: River Don D/S Flood Doors
Upstream winding hole: above structure
Downstream winding hole: below structure
Updates
15/12/2019 17:39
The doors have now been lifted, the navigation is now open again along the New junction Canal
14/12/2019 10:35
Due to high levels within the river, the safety doors at Don Aqueduct have had to be lowered. CRT will monitor river levels over next 24 hours
Description
Due to high levels within the river, the safety doors at Don have had to be lowered. CRT will monitor river levels over next 24 hours