Hebden Bridge Railway Bridge Repairs

Detail

From Date: 26/11/2019 08:00

To Date: 23/12/2019 18:00 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Rochdale Canal

Starts at: Railway Bridge

Ends at: Railway Bridge

Updates

17/12/2019 11:51

The repair works have been extended to the 23rd December due to the extensive repairs that are required to the structure.

Description

Amco will be undertaking repairs to a Network Rail structure by the means of erecting scaffolding above the towpath to undertake the works.

Boaters and other navigation traffic may be passing by for up to 20 minutes to enable the contractor to move out of the way during erection and dismantling of scaffold.

Scaffolding will not disrupt boaters throughout the duration of the works. Towpath access will be maintained at all times during the works.