Brayton Railway Bridge Inspection

Detail

From Date: 15/11/2019 08:00

To Date: 15/11/2019 18:00 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Selby Canal

Starts at: Brayton Railway Bridge

Ends at: Brayton Railway Bridge

Description

Contractors Stroma are undertaking a bridge inspection of Brayton railway Bridge. 

There will be an a inspection of the  underneath of the bridge structure using a pontoon and fixed scaffold,that will move between each span of the structure using a boat if required.

Boaters and other navigating traffic maybe affected by up to 20 minutes until the pontoon is moved into place. 

Can skippers of all craft please slow down when approaching the area.