Brayton Railway Bridge Inspection
Detail
From Date: 15/11/2019 08:00
To Date: 15/11/2019 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Selby Canal
Starts at: Brayton Railway Bridge
Ends at: Brayton Railway Bridge
Description
Contractors Stroma are undertaking a bridge inspection of Brayton railway Bridge.
There will be an a inspection of the underneath of the bridge structure using a pontoon and fixed scaffold,that will move between each span of the structure using a boat if required.
Boaters and other navigating traffic maybe affected by up to 20 minutes until the pontoon is moved into place.
Can skippers of all craft please slow down when approaching the area.