Bridge 7, Ashton Canal
Detail
From Date: 31/10/2019 07:00
To Date: 31/10/2019 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Ashton Canal
Starts at: Bridge 7
Ends at: Bridge 7
Description
Please be advised third party contractors will be onsite to carry out a detailed inspection of Bridge 7 on the Ashton Canal.
To be able to inspect the bridge, a pontoon and scaffold tower will be in place. We politely request both towpath and canal customers to approach the area with caution and be prepared to stop to allow the pontoon and equipment to be moved out the way for safe passage. We anticipate a wait of no longer than 30 minutes. Please listen to any advice that may be given by the onsite banksmen to take note of the signage onsite.