STW pipe bridge at Stockton Brook
Detail
From Date: 14/10/2019 08:00
To Date: 20/12/2019 17:00 inclusive
Type: Advice
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Caldon Canal
Starts at: Lock 6 Fenns Lock
Ends at: Bridge 24A Railway Bridge
Updates
19/11/2019 13:54
The works have been delayed by the bad weather and engineering difficulties, this has pushed back the completion date.
Description
Third party contractors will be removing overhanging vegetation and then carrying out repairs to the pipe bridge crossing via a temporary scaffold over the canal and towpath. Contractors will also be accessing the site on foot via the towpath from bridge 25.