Yew Tree Foot & Swing Bridge
Detail
From Date: 06/01/2020 08:30
To Date: 06/03/2020 17:00 inclusive
Type: Towpath Closure
Reason: Repair
Is the towpath closed? Yes
Location
Closest waterway: Ashton Canal
Starts at: Bridge 15, Copperus Lane Swing Bridge
Ends at: Lock 16, Edge Lane
Description
The Towpath will be closed between bridge 15 and Lock 16 to allow the removal and replacement of the existing footbridge and the full removal of the disused swing bridge.
Please be advising that while this work is been carried out, boaters may encounter a small delay of less than 30mins whilst navigating this section.