Gas pipe running adjacent to Holloway Bank Basin Bridge, approximately 90 metres West of Holloway Bank Road Bridge on the North towpath.
Detail
From Date: 20/08/2019 08:00
To Date: 24/08/2019 18:00 inclusive
Type: Advice
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Tame Valley Canal
Starts at: Holloway Bank Basin Bridge
Ends at: Holloway Bank Basin Bridge
Description
Cadent Gas wish to remove the monitoring equipment currently attached to the gas pipe, following this painting contractors will repaint any small damaged areas of paintwork to the pipe. The towpath and navigation will remain open with the users managed safely through the works.