Floating pontoon works near Bridge 7, Lee Navigation
Detail
From Date: 31/07/2019 00:00
To Date: 31/07/2019 23:59 inclusive
Type: Advice
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Lee Navigation
Starts at: Bridge 7 (Railway)
Ends at: Bridge 7 (Railway)
Description
Please be aware that Network Rail Contractors will be carrying out a detailed inspections of the railbridge using a scaffold tower pontoon.
Navigation will remain open but boats might be held up briefly to enable contractors carry out works safely.
The canal towpath will not be affected by the works.