South of Bridge 66, Clifton Road Bridge, Hillmorton, Rugby
Detail
From Date: 17/06/2019 06:00
To Date: 21/06/2019 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? Yes
Location
Closest waterway: Oxford Canal
Starts at: Bridge 66, Clifton Road
Ends at: Bridge 66, Clifton Road
Description
Third party contractors’ construction the Rugby Radio Link Road Canal bridge will mount MEWPs along the east/west embankments to facilitate the removal of the temporary walkway platform along the bridge parapet edge.
During the removal operations, boats will experience minor delays as a Stop/Go operation is in place to ensure the works can be undertaken safely.
Canal boaters should expect minor delays as they pass through the works. However, the canal navigation will remain open.
The Towpath will be closed with a short diversion in place.