Towpath upgrade - Lock 18 to Bridge 19, Stubbings Road Bridge
Detail
From Date: 17/06/2019 08:00
To Date: 30/11/2019 18:00 inclusive
Type: Towpath Closure
Reason: (Re)Construction
Is the towpath closed? Yes
Location
Closest waterway: Rochdale Canal
Starts at: Lock 18
Ends at: Bridge 19, Stubbings Road Bridge
Description
Upgrading of the towpath surface is taking place between Lock 18 and Stubbings Road Bridge. Wash walls will also be repaired where necessary.
The alternative towpath route will be along Rochdale Road at the Todmorden end going onto Halifax Road.
The contractors will endeavour to keep as much as the towpath open as possible during these works.