Mooring Restriction, Bow River Village Development, E3 3UB, Lee Navigation
Detail
From Date: 03/06/2019 00:00
To Date: 05/07/2019 23:59 inclusive
Type: Advice
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Lee Navigation
Starts at: Bridge 4, Three Mills Lane
Ends at: Bridge 5, Bow Bridge (A11)
Description
Higgins Construction Contractors will be undertaking repair works to the towpath side river wall, from a floating pontoon, adjacent to the Bow River Village site.
Mooring will be suspended from adjacent Bow River Village Development, E3 3UB ending 90metres North of this point.
Advanced warning signage will be displayed either side of the works.