Description
A stoppage is required to carry out the replacement of the stop lock gates.
The charity making life better by water
Making life better by water
Starts: 4 November 2019 08:00 am
Ends: 13 December 2019 04:00 pm inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Closest waterway | Macclesfield Canal |
Starts at | Lock 13, Hall Green Stop Lock |
Ends at | Lock 13, Hall Green Stop Lock |
Upstream winding hole | Between Bridges 86 and 87 |
Downstream winding hole | Hardingswood Junction |
A stoppage is required to carry out the replacement of the stop lock gates.
Sign up to our monthly newsletter and be the first to hear about campaigns, upcoming events and fundraising inspiration