Between Bridge 41c and Bridge 43, Bracebridge, Chesterfield Canal
Detail
From Date: 18/11/2019 08:00
To Date: 13/12/2019 16:00 inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? Yes
Location
Closest waterway: Chesterfield Canal
Starts at: Bridge 43, Priorswell Road Bridge
Ends at: Bridge 41C, Morse Lock Footbridge
Upstream winding hole: Worksop Winding Hole, Near Bridge 41A
Downstream winding hole: Bracebridge Winding Hole, Adjacent to Bridge 44A
Description
To carry out repairs to address the collapsed washwall and undermining of the towpath.