Refurbishment Goole Pipe Bridge

Detail

From Date: 18/02/2019 08:00

To Date: 26/05/2019 18:00 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Aire & Calder Navigation Main Line

Starts at: Goole Pipebridge

Ends at: Goole Pipebridge

Description

Northern Gas Networks will be refurbishing Goole Pipe Bridge over the navigation.

The refurbishment of the pipe bridge will require scaffold to be approximately 150mm below the pipe bridge.

This means a reduced headroom, however this is 460mm higher than the adjacent rail bridge so boating traffic will not be affected but skippers of all craft should be aware of the reduced headroom at the pipe bridge.