Lee Navigation, Old Ford Lock
Detail
From Date: 02/07/2018 00:00
To Date: 23/04/2019 23:59 inclusive
Type: Navigation Closure
Reason: 3rd Party Works
Is the towpath closed? Yes
Location
Closest waterway: Lee Navigation
Starts at: Lock 19, Old Ford Lock, Western Side
Ends at: Bridge 11, Carpenters Road (A115)
Updates
18/12/2018 11:45
LLDC contractor, Balfour Beatty’s proposed date for craning the new footbridge (H16) will be from 26 January 2019 (9pm) - 27 January 2019 (6am).
A diversion route will be set up through the Olympic Park and a safety boat will be located within the Navigation.
18/12/2018 11:20
UPDATE
LLDC contractor, Balfour Beatty’s proposed date for craning the new footbridge (H16) will commence from 26 January 2019 (9pm) - 27 January 2019 (6am), Winter Stoppage.
Diversion route will be set up through the Olympic Park and a safety boat will be located within the Navigation.
18/12/2018 11:18
UPDATE
LLDC contractor, Balfour Beatty’s proposed date for craning the new footbridge (H16) will commence from 26 January 2019 (9pm) - 27 January 2019, Winter Stoppage.
Diversion route will be set up through the Olympic Park and a safety boat will be located within the Navigation.
06/11/2018 18:26
Footbridge Construction along the Lee Navigation just north of Old Ford Lock.
To protect the public using the towpath adjacent to the construction, hoarding will be erected and the front grass area concreted to provide a temporary towpath with safety fencing on the river’s edge. The grass area will be re-instated after the construction.
A short section of mooring will be suspended for the duration of the works.
Please be advised the navigation will be affected only during the bridge deck installation during the night time closure, which is planned for early next year under the Winter Stoppage Programme.
Description
Footbridge Construction along the Lee Navigation just north of Old Ford Lock.
To protect the public using the towpath adjacent to the construction, hoarding will be erected and the front grass area concreted to provide a temporary towpath with safety fencing on the river’s edge. The grass area will be re-instated after the construction.
A short section of mooring will be suspended for the duration of the works.