Lock 35, Turnerwood Quarry, Chesterfield Canal

Detail

From Date: 09/10/2017 08:00

To Date: 30/10/2017 16:00 inclusive

Type: Navigation Closure

Reason: Repair

Is the towpath closed? Yes

Location

Closest waterway: Chesterfield Canal

Starts at: Lock 35, Turnerwood Quarry Lock

Ends at: Lock 35, Turnerwood Quarry Lock

Upstream winding hole: Turnerwood Bridge winding hole

Downstream winding hole: Worksop winding hole

Updates

28/09/2017 14:37

Works to replace the bottom lock gates and to carry out repairs to the top lock gate, cill and lock ladder.

Please be aware the towpath will be closed during the duration of the works.

Please see the on-site signage for further information.

Description

Replace bottom lock gates and repairs to top lock gate. 

Repairs to cill and lock ladder

Note:  These dates are proposed outside the stoppage period