Lock 35, Turnerwood Quarry, Chesterfield Canal
Detail
From Date: 09/10/2017 08:00
To Date: 30/10/2017 16:00 inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? Yes
Location
Closest waterway: Chesterfield Canal
Starts at: Lock 35, Turnerwood Quarry Lock
Ends at: Lock 35, Turnerwood Quarry Lock
Upstream winding hole: Turnerwood Bridge winding hole
Downstream winding hole: Worksop winding hole
Updates
28/09/2017 14:37
Works to replace the bottom lock gates and to carry out repairs to the top lock gate, cill and lock ladder.
Please be aware the towpath will be closed during the duration of the works.
Please see the on-site signage for further information.
Description
Replace bottom lock gates and repairs to top lock gate.
Repairs to cill and lock ladder
Note: These dates are proposed outside the stoppage period