Bridge 70A Painting works

Detail

From Date: 23/01/2017 09:00

To Date: 23/01/2017 09:00 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Macclesfield Canal

Starts at: Bridge 70A

Ends at: Bridge 70A

Description

Contractors (J Murphy & Sons) are carrying bridge painting works under the bridge. The canal will be restricted at this location due to the use of a floating pontoon. 

All boat traffic should slowdown, approach the bridge with caution and be prepared to stop if requested. Short delays up to 10/15 minutes may be necessary for contractors to move the floating pontoon.