Bridge Inspection Works, Fairburn Railway Bridge
Detail
From Date: 05/12/2016 08:00
To Date: 07/12/2016 18:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Aire & Calder Navigation Main Line
Starts at: Fairburn Railway Bridge
Ends at: Fairburn Railway Bridge
Description
Contractors (Spartan Rescue) are carrying out bridge inspection works under Fairburn Railway Bridge.
The canal will be restricted at this location due to the use of a floating pontoon.
All boat traffic should slowdown, approach the bridge with care and be prepared to stop if requested.
Short delays up to 10/15 minutes may be necessary for contractors to move the floating pontoon.
For further information please call 0303 0404040.