Ashton Canal, Railway Bridge 7 inspection.
Detail
From Date: 19/12/2016 08:00
To Date: 23/12/2016 17:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: Ashton Canal
Starts at: Bridge 7
Ends at: Bridge 7
Description
BRIDGEWAY Contractors on behalf of Network Rail are carrying out bridge inspection works under the Railway Bridge. The canal will be restricted at this location due to the use of a floating pontoon.
All boat traffic should slowdown, approach the bridge with caution and be prepared to stop if requested. Short delays up to 10/15 minutes may be necessary for contractors to move the floating pontoon.