Lock 42 to 51, South Stratford Canal

Notice Details
From Date:
13th February 2017
To Date:
17th March 2017 at 23:59 inclusive
Type:
Navigation Closure
Reason:
Repair
Notice updates:
17/02/2017 @ 07:52

Just to clarify, the navigation will be physically closed and dewatered at Bishopton Lane Bridge 63 to enable waterway wall repairs to the bridge hole within the advertised stoppage period

20/12/2016 @ 15:26

Bridge 63 requires some additional repair works to the waterway wall. These repairs will be completed within the existing stoppage dates

Description:

Lock 42: Top and Bottom gate repairs and masonry repairs within the lock chamber.

Lock 46: Top gate repairs and masonry repairs within the chamber

Lock 51: Bottom gate replacements.

Location:
South Stratford Canal
Starts At:
Lock 42
Ends At:
Lock 51
Up Stream Winding Hole:
Turning Point, North of Bridge 59, Featherbed Lane
Down Stream Winding Hole:
Bancroft Basin
Search again

Notice Location