Acton Swing Bridge, Weaver Navigation

Notice Details
From Date:
23rd January 2017 at 08:00
To Date:
31st March 2017 at 18:00 inclusive
Type:
Navigation Closure
Reason:
Repair
Notice updates:
13/12/2016 @ 11:49

Due to the installation of scaffolding, the bridge will not be able to swing/be opened between the dates of 23rd of January to the 31st of March 2017.  However - craft with an air-draft of less than 2.5 meters will still be able to pass under the bridge, but may need to wait a short period for the site to be made safe.

Description:

Bridge strengthening works

Location:
Weaver Navigation
Starts At:
Acton Swing Bridge
Ends At:
Acton Swing Bridge
Up Stream Winding Hole:
Weaver Navigation Arm, near Acton Lane
Down Stream Winding Hole:
Frodsham Cut (Weaver Navigation) Junction
Search again

Notice Location