Bryn Mawr, Culvert 40 - Works Deferred
Detail
From Date: 16/01/2017 00:00
To Date: 16/01/2017 00:15 inclusive
Type: Navigation Closure
Reason: Repair
Is the towpath closed? No
Location
Closest waterway: Montgomery Canal
Starts at: Culvert 40
Ends at: Culvert 40
Upstream winding hole: Between Belan Locks 1 & 2
Downstream winding hole: Welshpool Wharf
Updates
02/11/2016 15:44
Please be advised that the planned stoppage has been cancelled this year as we require further time to conclude design work and access negotiations. The works have been deferred until 2017/18.
Description
Culvert relining. Dewatering likely to be required.