Llangattock and Dardy Channel
Detail
From Date: 31/10/2016 00:00
To Date: 31/03/2017 23:59 inclusive
Type: Navigation Closure
Reason: (Re)Construction
Is the towpath closed? Yes
Location
Closest waterway: Monmouthshire & Brecon Canal
Starts at: Bridge 114, Lower Yard
Ends at: Br.122 The Fro
Upstream winding hole: Between Bridges 123 and 122
Downstream winding hole: Between Bridges 109 and 110
Updates
22/11/2016 09:49
Relining channel between Bridge 115 and 116, concrete lining repairs between Bridge 118 and 122
Please be advised the towpath between bridges 114-116 is closed and we have a diversion in place.
For more information please contact us at [email protected]
22/11/2016 09:40
Relining channel between Bridge 115 and 116, concrete lining repairs between Br 118 and 122
Please be advised the towpath between bridges 114-117 is closed.
For more information please contact us at [email protected]
Description
Relining channel between Br 115 and 116, concrete lining repairs between Br 118 and 122