Tinsley Coleridge Road Bridge 11 (Pothouse Bridge)

Detail

From Date: 25/04/2016 07:30

To Date: 03/06/2016 17:30 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Sheffield & Tinsley Canal

Starts at: Tinsley Coleridge Road Bridge 11

Ends at: Tinsley Coleridge Road Bridge 11

Updates

19/05/2016 10:08

Contractors require scaffolding to be in place until Monday 23rd  of May to enable recent graffiti to be removed from the structure. The headroom will be restricted by 400mm due to the scaffold. The general works will still be taking place until the 3rd of June 2016.

05/04/2016 08:07

We have been advised by the Contractors that this work will now take place between 25th April and 3rd June 2016.

Description

Contractors (Amey LG) are carrying out bridge refurbishment works under the Bridge. The canal will be restricted at this location due to the use of a safety boat and Pontoon between 07.30 and 17.30 Monday to Friday.

All boat traffic should slowdown, approach the bridge with caution and be prepared to stop if requested.  Short delays up to 10/15 minutes may be necessary for contractors to move.