Boothferry Bridge River Ouse Nr. Goole
Detail
From Date: 01/05/2019 08:30
To Date: 01/05/2019 15:00 inclusive
Type: Advice
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: River Ouse
Starts at: Boothferry Road Bridge
Ends at: Boothferry Road Bridge
Updates
26/04/2019 12:03
This work has been postponed and will now be taking place on the 1st May. All aspects of the work remain unchanged.
Description
Contractors will be undertaking vegetation clearance work on the south bank of the river approximately 100m upstream of Boothferry Bridge. All work will be undertaken from the river bank. A safety boat call sign MELI4 will be in attendance throughout the works. MELI4 will maintain a listening watch on VHF Marine Band channel 9.
Skippers of all craft are advised to approach with caution and reduce wash to a minimum.