Railway Bridge 37
Detail
From Date: 23/02/2019 00:00
To Date: 12/05/2019 00:00 inclusive
Type: Navigation Restriction
Reason: 3rd Party Works
Is the towpath closed? No
Location
Closest waterway: River Soar
Starts at: Bridge 37
Ends at: Bridge 37
Updates
17/04/2019 15:23
There has been an extension to the below works on Railway Bridge 37. The contractors have now confirmed the works will be on-going until 12th May.
The encapsulated scaffolding will still be installed at the level of the bridge, so no obstruction to boats or pedestrians is anticipated. However, short delays may be incurred during the erection/dismantling of the scaffolding.
For any up to date information please contact Newark on 0303 040 4040.
17/04/2019 14:58
There has been an extension to the below works on Railway Bridge 37.
The encapsulated scaffolding will still be installed at the level of the bridge, so no obstruction to boats or pedestrians is anticipated. However, short delays may be incurred during the erection/dismantling of the scaffolding.
We will update the notice with end dates once these have been confirmed with the contractors.
For any up to date information please contact Newark on 0303 040 4040.
Description
Contractors (Centregreat) will be working on behalf of Great Central Railway will be carrying out repair and refurbishment works to the disused railway Bridge 37.
AN encapsulated scaffolding will be installed at the level of the bridge, so no obstruction to pedestrians or boats is anticipated, however short delays may be incurred during the erection/dismantling of the scaffolding.
Please wait on site and follow any advice given by the staff/contractors when passing.