Ashted Tunnel, Birmingham
Detail
From Date: 28/01/2019 08:00
To Date: 29/01/2019 18:00 inclusive
Type: Towpath Closure
Reason: 3rd Party Works
Is the towpath closed? Yes
Location
Closest waterway: Digbeth Branch (Birm'm & Fazeley)
Starts at: Ashted Tunnel
Ends at: Ashted Tunnel
Description
Contractors Redbox Surveys will be undertaking a detailed 3D survey of the tunnel. To undertake the survey safely the towpath through the tunnel will need to be closed. A division route and signage will be in place during the closure.