Bridge 1c, Nottingham, of the Nottingham & Beeston Canal

Detail

From Date: 12/11/2018 08:00

To Date: 24/12/2018 23:00 inclusive

Type: Navigation Restriction

Reason: 3rd Party Works

Is the towpath closed? No

Location

Closest waterway: Nottingham & Beeston Canal

Starts at: Bridge 1c, Lms Main Line No 25

Ends at: Bridge 1c, Lms Main Line No 25

Updates

19/11/2018 15:45

As part of the bridge deck replacement works, J Murphy & Sons, working on behalf of Network Rail, will be installing a pontoon and scaffolding system in the offside navigational channel, extending approximately 1m into the main (towpath side) navigational channel.  The towpath side channel will remain open with reduced width.

Please be aware the navigational width during the works will be approximately 6.0 m under the bridge.

The pontoon and scaffolding will be in-situ for the duration of the works.   

Description

As part of the bridge deck replacement works, J Murphy & Sons, working on behalf of Network Rail, will be installing a pontoon and scaffolding system in the offside navigational channel, extending approximately 1m into the main (towpath side) navigational channel.  The towpath side channel will remain open with reduced width.

The pontoon and scaffolding will be in-situ for the duration of the works.   

We have worked closely with Network Rail to minimise disruption during the bridge deck replacement works.  There are a number of separate elements affecting the navigation.  Individual notices will be raised for each element, which are as follows:

12/11/2018 to 24/12/2018           Navigation restriction

01/12/2018 to 02/12/2018           Overnight closure

08/12/2018 to 09/12/2018           Overnight closure

15/12/2018 to 16/12/2018           Overnight closure

24/12/2018 to 28/12/2018           Navigation closure

28/12/2018 to 01/02/2019           Navigation restriction